Southeast Asia

Southeast Asia is our shortest sea leg — a container leaves South China and is in Singapore or Port Klang inside two weeks. For distributors that means fast replenishment and small working capital; for projects it means pods, lighting and panels on site while the fit-out is still running.

What buyers in Southeast Asia ask

How fast can you replenish a distributor?

Production lead time runs about 25–35 days depending on the mix; sea freight adds 5–12 days to most SEA ports. Many distributors keep a demonstration pod and a rolling mixed container on the water — we plan that cycle with you and hold your tier pricing for the year.

Do PET felt products cope with humidity?

PET felt is polyester — it does not rot, swell or feed mould the way organic fibres do, which is why it is the standard acoustic material in tropical fit-outs. Pods add their own forced ventilation, so interior air keeps moving even when the building AC cycles down at night.

Can we start below a full container?

MOQ is 10 sets, and models can be mixed — a first order is often two or three pod sizes plus a lighting and panel starter set, shipped LCL or as a shared container. It is enough to equip a showroom corner and run your first project pilot before committing to full containers.

Logistics & compliance

Main ports

Singapore · Port Klang (MY) · Jakarta (ID) · Haiphong & Ho Chi Minh (VN) · Bangkok (TH)

Sea transit

5–12 days sea freight from South China, typical

Document set

CI / PL / BL / COO (Form E for ASEAN tariff preference) + ISO 23351-1 & 3C test reports

Power & sockets

Pods 110–220 V universal · Type G/M sockets on request · luminaires 220–240 V native

Recommended for this market